Acolyte RibbonLyte in Channel with Mounting Clips Manual do Utilizador Página 4

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 6
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 3
All artwork and images copyright Acolyte Industries Inc.
Use or reprinting prohibited unless explicitly approved by Acolyte Industries.
INSTALLATION -- STEPS 5-8
5
7
6
8
PAGE 3
Clean the mountain surface free of dust
and debris using a wet cloth. For metal
mounting surfaces use rubbing alcohol (D)
to wipe clean.
After surface is dry, apply 1/16” double-sided
tape (E) to the desired mounting path of
your RibbonLyte.
(D)
(E)
Remove backing from double-sided tape
(E).
(E)
Remove the backing from the RibbonLyte
(F) that you are going to be applying atop
the double-sided tape.
Vista de página 3
1 2 3 4 5 6

Comentários a estes Manuais

Sem comentários